ALF COLEMAN ROAD IMPROVEMENT PROJECT FROM SR 392A (HUTCHISON BLVD.) TO US 98 (PANAMA CITY BEACH PARKWAY) City Project CR0072
Vendor Ranking
Letting: March 9, 2023, 2:00 PM CST
Contract Time: Substantial Completion: 289 Calendar Days
Final Acceptance: 289 Calendar Days + 30 Days
Contract Description: This project includes the installation of concrete sidewalks and street lighting along with the reconstruction of Alf Coleman Road from Hutchison Boulevard to Panama City Beach Parkway, including storm sewer piping, inlet structures, junction boxes and utilities. This project is approximately 3150 feet in length.
Rank | Vendor | Bid Type | Bid Status | Total Bid | Percent of Low Bid |
1 | Gulf Coast Utility Contractors, LLC | Responsive | Winning Bid | $5,357,600.65 | 100.00% |
2 | C.W. Roberts Contracting, Inc. | Responsive | Non-Winning Bid | $6,768,777.77 | 126.34% |
WINNING BID: Gulf Coast Utility Contractors, LLC
“It is the intent of the City of Panama City Beach to award the above City Project CR0072 to the Contractor with the winning bid as shown above. Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.”